Manufacturing of fuel system parts is finished. Fuel equipment was assembled, tests were conducted on an unpowered stand.
The CAD software package was adopted as a design tool.
The main engine parameters were determined, it was decided to use a turbocharger. A preliminary version of the combustion chamber geometry of the designed engine has been developed. The possibility of remote exchange of documentation and meetings arrangement has been fixed up.